Steel structure warehouse is belongs to prefabricated metal structure building, the main bearing parts of steel structure workshop/warehouse are composed of steel, including steel structure foundation, steel column, steel beam, steel roof truss and steel roof.
The construction cost of a steel structure warehouse is lower than that of a traditional warehouse, but its structural strength is better than that of a traditional warehouse. If you have any needs, please contact our technical staff.
The prefabricated steel structure warehouse belongs to a Prefabricated industrial metal building, which is crafted from a steel structure foundation, steel beams, and steel columns. Steel structure warehouse is lower price in construction cost. A prefabricated metal structure industrial warehouse is more cost-effective and lightweight. A prefabricated steel structure warehouse is much easier to construct.
The steel structure industrial warehouse is a dry construction, which has outstanding environmental protection advantages. It can reduce the impact of project construction on the environment and nearby residents.
Yuanfu is a Prefabricated Steel Structure building manufacturer, that can design and produce steel structure buildings, such as industrial warehouses, industrial workshops, Large commercial centers, Schools, Hospitals, and hotels. If you have a metal structure building requirement, please get in touch with us, right now.
Metal structure warehouse building can save construction costs and workers’ costs. The cost of building a steel structure warehouse is 20% to 30% lower than a typical warehouse construction cost, and it is more secure and stable.
Items | Specification | |
Main Steel Frame | Column/Beam | Q235, Q345 Welded H Section Steel |
Secondary Frame | Purlin | Q235 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof /Wall Panel | EPS Sandwich Panel/Glass Fiber Sandwich Panel/Rock Wool Sandwich Panel/Pu Sandwich Panel/Steel Sheet |
Accessories | Window | Aluminum Alloy Window / PVC Window/Sandwich Panel/Window |
Door | Sliding Sandwich Panel Door/Rolling Metal Door/Personal Door | |
Rain-spout | PVC | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Temperature | Suitable temperature.-50°C~+50°C |
COLOR OF ROOF / WALL PANELS COMMONLY USED IN STEEL STRUCTURE WORKSHOP / WAREHOUSE
The color of roof / wall panels commonly used in steel structure workshop / warehouse is as follows. Other special colors can also be customized for you.
ACCORDING TO THE FREQUENCY OF CRANE USE, CRANE WORKING SYSTEM LEVEL CORRESPONDS TO THE FOLLOWING WORKING LEVEL:
According to the frequency of crane use, crane working system level corresponds to the following working level: Lightweight: A1-A3 Intermediate: A4-A5 I Heavyweight: A6-A7 I Extra heavyweight: A8
--Civil works and the installation of anchor bolts need to be completed before the steel structures enter the site.
--The construction site needs to meet the construction requirements, be able to supply water and electricity, harden the road and level the site.
--The tools and machinery required for construction need to be prepared in advance and enter the site according to the construction schedule to meet the construction needs.
--Steel structure connection procedure: transportation to the site → acceptance → upright steel column → steel beam assembly and installation → support system installation → purlin installation → secondary steel structure installation → acceptance.
--Roof structure installation process: preparation work → roof beam installation and alignment → roof purlin installation and fixation → roof strut and support installation and fixation.
How Much Time Does It Take to Build?
Our focus is on providing a swift and efficient service. Ordinarily, the period of production is 30 days or thereabouts. For the period of erection, it usually depends on the enormity of your structure, the excavation labor required, and how quickly one can obtain the required consents. We provide a full outline of the construction process whenever you contact us.
Are Your buildings Customized?
Our control of every aspect of the building ensures that we can customize the structures to suit your needs and desires. We are therefore able to customize every aspect, including model, design and the facets of manufacturing; our high quality steel structures are therefore customization. Regardless of your requirements and demands, we are experts in developing the right solution for your venture. Our able team will be with you every step of the way.
Can You Relocate Your Building in the Future If We Shift?
The prefabricated and lightweight construction ensures that they are easy to move while being tough and durable the structure can be detached and re-assembled on a new site without complications.
Are Custom Quotes Charged?
On the light gauge steel framing parcels, we do not levy any costs for customized quotes. The same applies to the pr-engineered buildings and structural buildings. Kindly send to us your working set plans or comprehensible sketches with measurements.
You can also choose any of our provided plans. If you have not developed any plans but you are interested, we know quality architects who will generate a design for your specifications at a pocket friendly price that will not be charged right away but will be subtracted from the ultimate purchase order.
Do We Work With Other Professional Architects, Engineers, Builders, and Developers?
To make a project truly successful, we pride in having a working relationship with great professionals including but not limited to engineers, architects, developers and builders. We work with many steel operatives from many parts of the world, and we are ready to give you heart’s desire.