We understand the importance of protecting our investments as aircraft owners. Avoiding damage by Mother Nature and simple depreciation from exposure are key. Yuan-fu works with clients in many countries on designing and producing the ideal steel structure aircraft hangar for your application. We produce the strongest metal and steel buildings available, and have never experienced any aircraft damage due to steel building failure.
We understand the importance of protecting our investments as aircraft owners. Avoiding damage by Mother Nature and simple depreciation from exposure are key. Yuan-fu works with clients in many countries on designing and producing the ideal steel structure aircraft hangar for your application. We produce the strongest metal and steel buildings available, and have never experienced any aircraft damage due to steel building failure.
Yuanfu steel structure aircraft hangar has features of high fire resistance, strong corrosion resistance. Steel structure warehouse is mainly refers to the main bearing component is composed of steel. Including the steel columns, steel beam, steel structure, steel roof truss.Each component using welds, bolts or rivets to connect.
The roof and wall can be made of composite panel or veneer. Galvanized sheet metal can prevent rust and corrosion. The use of self-tapping screw can make the connection between the plates more closely, to prevent leakage. You can also use composite panel for roof and wall. The sandwich is polystyrene, glass fiber, rock wool, polyurethane. They have good thermal insulation, heat insulation, fire-retardant. The wall of the steel structure maintenance also can use brick wall. The cost of a brick wall is higher than galvanized steel roof and wall.
Protecting your aircraft from damage brought about by the elements starts with providing the right steel aircraft hangar building. Prefab airplane hangar provides the protection that your aircraft needs. But rather than a custom hangar that cost a lot of money, one of the options aircraft owners have is the prefab airplane hangar. This type of hangar makes use of prefabricated materials.
Items | Specification | |
Main Steel Frame | Column/Beam | Q235, Q345 Welded H Section Steel |
Secondary Frame | Purlin | Q235 C and Z purlin |
Knee brace | Q235 Angle Steel | |
Tie Rod | Q235 Circular Steel Pipe | |
Brace | Q235 Round Bar | |
Vertical and Horizontal Support | Q235 Angle Steel, Round Bar or Steel Pipe | |
Maintenance system | Roof /Wall Panel | EPS Sandwich Panel/Glass Fiber Sandwich Panel/Rock Wool Sandwich Panel/Pu Sandwich Panel/Steel Sheet |
Accessories | Window | Aluminum Alloy Window / PVC Window/Sandwich Panel/Window |
Door | Sliding Sandwich Panel Door/Rolling Metal Door/Personal Door | |
Rain-spout | PVC | |
Wind Resistance Grade | 12 Grades | |
Earthquake-resistance | 8 Grades | |
Structure Usage | Up to 50 years | |
Temperature | Suitable temperature.-50°C~+50°C |
Ⅰ. Material grade
1. Carbon structural steel: Q235B
2. High-strength structural steel: Q345B
3. Special purpose steel
Ⅱ. Quality standard
1. Certificate: ISO9001: 2008
2. Code for design of steel structure: GB 50017-2003
3. Technical code of cold-formed thin-wall steel structure: GB50018-2002
4. Load code for the design of building structures. GB 50009-2006
5. Construction quality acceptance of steel: GB50205-2001
6. Code for design, construction and acceptance of high strength for steel structure, JGJ82-2011
7. Technical specification for welding of steel structure building: JGJ 81-2002
8. Technical specification for steel Structures of tall buildings: (JGJ99-98)
Ⅲ. Structure Assembly
1. Steel Framework:
Component: H-Column, H-Beam & C / Z-Purlin
Connection of steel structure method: Welding, Bolted
2. Surface treatment: Painting, Galvanized
3. Roof &Wall: colored steel tiles or colored steel sandwich panel as per request
4. Doors: Rolling or Pushing, as request
Choosing a steel structure drawing or plan involves assessing the needs of your business when it comes to size. It’s important to understand what tasks need to be done to be able to choose a plan that will ensure these tasks will be carried out. We can supply your business with a carefully laid-out structure drawing or plan that fits your specific needs, especially when it comes to size and functionality.
--Civil works and the installation of anchor bolts need to be completed before the steel structures enter the site.
--The construction site needs to meet the construction requirements, be able to supply water and electricity, harden the road and level the site.
--The tools and machinery required for construction need to be prepared in advance and enter the site according to the construction schedule to meet the construction needs.
--Steel structure connection procedure: transportation to the site → acceptance → upright steel column → steel beam assembly and installation → support system installation → purlin installation → secondary steel structure installation → acceptance.
--Roof structure installation process: preparation work → roof beam installation and alignment → roof purlin installation and fixation → roof strut and support installation and fixation.