Steel Structure Workshop

Yuanfu Steel Structure Company is the world’s leading manufacturer of prefabricated steel buildings. We can offer you steel warehouses, factories, workshops, steel sheep pens, stables and piggeries, metal hangars, metal greenhouses, and self-storage facilities. Yuanfu steel buildings are strong, lightweight, fast-constructing, and earthquake-resistant. Contact us to frame your steel building.

Description Parameter Advantage Installation Application

Product Description

Steel structure workshop building is made from welding H section steel as column and beam, some of them has crane beam, it's made from H steel beam too. Galvanized C , Z section steel as wall purlin and roof purlin, Its wall and roof are made of metal steel sheet or sandwich panel. The door is electric shutter door or flat open door. Window is PVC or aluminum window. With the extensive use of steel structure, its advantages are increasingly significant compared with traditional building.

 

Parameter

Items Specification
Main Steel Frame Column/Beam Q235, Q345 Welded H Section Steel
Secondary Frame Purlin Q235 C and Z purlin
Knee brace Q235 Angle Steel
Tie Rod Q235 Circular Steel Pipe
Brace Q235 Round Bar
Vertical and    Horizontal   Support Q235 Angle Steel, Round Bar or Steel Pipe
Maintenance system Roof /Wall Panel EPS Sandwich Panel/Glass Fiber Sandwich Panel/Rock Wool Sandwich Panel/Pu Sandwich Panel/Steel Sheet
Accessories Window Aluminum Alloy Window / PVC Window/Sandwich Panel/Window
Door Sliding Sandwich Panel Door/Rolling Metal Door/Personal Door
Rain-spout PVC
Wind Resistance Grade 12 Grades
Earthquake-resistance 8 Grades
Structure Usage Up to 50 years
Temperature Suitable temperature.-50°C~+50°C

 

TYPES OF STEEL ROOF TRUSSES

COLOR OF ROOF / WALL PANELS COMMONLY USED IN STEEL STRUCTURE WORKSHOP / WAREHOUSE

The color of roof / wall panels commonly used in steel structure workshop / warehouse is as follows. Other special colors can also be customized for you.

ACCORDING TO THE FREQUENCY OF CRANE USE, CRANE WORKING SYSTEM LEVEL CORRESPONDS TO THE FOLLOWING WORKING LEVEL:

According to the frequency of crane use, crane working system level corresponds to the following working level: Lightweight: A1-A3 Intermediate: A4-A5 I Heavyweight: A6-A7 I Extra heavyweight: A8

Advantages

  • 1.Seismic resistance. The steel structure system has a strong ability to resist earthquake and horizontal load.
  • 2.Wind resistance. Steel structure building is light in weight, high in strength, good in rigidity and plasticity.
  • 3.Durability. The steel structure is composed of cold-formed thin-walled steel members. The steel frame is made of super-anti-corrosive high strength cold-rolled galvanized sheet, which effectively avoids the influence of steel plate corrosion during construction and use, and increases the service life of steel members.
  • 4.Thermal insulation. The thermal insulation material adopted has good thermal insulation effect.
  • 5.Health. Steel structural materials can be recycled 100%, so that they are truly green and pollution-free. To meet the requirements of ecological environment is conducive to health.
  • 6.Quick and convenient. Installation can be completed quickly without the influence of environmental season.

Installation

--Civil works and the installation of anchor bolts need to be completed before the steel structures enter the site.

--The construction site needs to meet the construction requirements, be able to supply water and electricity, harden the road and level the site.

--The tools and machinery required for construction need to be prepared in advance and enter the site according to the construction schedule to meet the construction needs.

--Steel structure connection procedure: transportation to the site → acceptance → upright steel column → steel beam assembly and installation → support system installation → purlin installation → secondary steel structure installation → acceptance.

--Roof structure installation process: preparation work → roof beam installation and alignment → roof purlin installation and fixation → roof strut and support installation and fixation.

Application

Frequently Asked Questions (FAQs)

How Much Time Does It Take to Build?

Our focus is on providing a swift and efficient service. Ordinarily, the period of production is 30 days or thereabouts. For the period of erection, it usually depends on the enormity of your structure, the excavation labor required, and how quickly one can obtain the required consents. We provide a full outline of the construction process whenever you contact us.

Are Your buildings Customized?

Our control of every aspect of the building ensures that we can customize the structures to suit your needs and desires. We are therefore able to customize every aspect, including model, design and the facets of manufacturing; our high quality steel structures are therefore customization. Regardless of your requirements and demands, we are experts in developing the right solution for your venture. Our able team will be with you every step of the way.

Can You Relocate Your Building in the Future If We Shift?

The prefabricated and lightweight construction ensures that they are easy to move while being tough and durable the structure can be detached and re-assembled on a new site without complications.

Are Custom Quotes Charged?

On the light gauge steel framing parcels, we do not levy any costs for customized quotes. The same applies to the pr-engineered buildings and structural buildings. Kindly send to us your working set plans or comprehensible sketches with measurements.

You can also choose any of our provided plans. If you have not developed any plans but you are interested, we know quality architects who will generate a design for your specifications at a pocket friendly price that will not be charged right away but will be subtracted from the ultimate purchase order.

Do We Work With Other Professional Architects, Engineers, Builders, and Developers?

To make a project truly successful, we pride in having a working relationship with great professionals including but not limited to engineers, architects, developers and builders. We work with many steel operatives from many parts of the world, and we are ready to give you heart’s desire.

GET IN TOUCH

Contact us

    • Name:

      *

    • Email:

      *

    • Country:

    • TEL:

    • Message:

      *

    Home Tel Mail Inquiry